We met up with contractor during lunch time to check on the tiles, confirm toilet design and some layouts.
All hacking & demolition were completed... and windows grills were also removed.
Following these would be tiling work for about 2 weeks. :)
Wiring of kitchen were dismantled and walls have been applied with chemical cement to prepare for tiling..
Here's our 1st batch of tiles. I guess the tiling work should be starting pretty soon.. =D
Thank you, Lord for the progress so far. ![](http://images.multiply.com/common/smiles/star.png)
![](http://images.multiply.com/common/smiles/star.png)
No comments:
Post a Comment